Auto Manual of VW Passat B5



VW Passat
The maintenance instruction
1. Maintenance service
2. Engines
3. Cooling system
4. Fuel system
5. Engine management
6. An exhaust system
7. Transmission
8. A running gear
9. A steering
10. Brake system
11. A body
- 12. Heating, ventilation
   12.2. Ventilating nozzles
   12.3. The control panel a heater
   12.4. The lever central заслонки
   12.5. The block of management of a heater
   12.6. The block of resistors of a heater
   12.7. The block of management of a heater and the conditioner
   12.8. The conditioner compressor
   12.9. The heater fan
13. An electric equipment



49e3918c

12.7. The block of management of a heater and the conditioner Removal

PERFORMANCE ORDER
1. Remove the decorative panel of the block of management of a heater and the conditioner. For this purpose, using a screw-driver with are thin an edge, wring out clamps, it is located ные on panel corners.
2. Unscrew 4 screws, крепящие the block of management of a heater and the conditioner.
3. Disconnect from the management block electric sockets.

Installation

PERFORMANCE ORDER
1. Before installation check up smoothness of a course of cables of management and, if necessary, replace them.
2. For simplification of identification of a cover of cables of management have different colour.
3. Dress the rounded off ends of cables (1) on levers (2) managements of a heater and the conditioner, and covers of cables fix on the case of the block of management.
4. Connect to the management block an electric socket.
5. Insert the management block together with the connected cables into the panel of devices.
6. Establish and screw two screws the heater panel.
7. Screw in four screws, крепящие the block of management of a heater and the conditioner.
8. Insert the decorative panel of the block of management before its accurate fixing.